Customization: | Available |
---|---|
After-sales Service: | 7-24 Service |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 25000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
SC200200 Three-Motor Worm Reducer Type Hoist
♦ The main electrical components are of brand.Shandong Dongyue Lifting Fire Fighting Equipment Manufacturing Co.,Ltd was established in 2001. With a strong technological background, it integrates high-level corporate culture into the lives of employees and contributes high-quality construction and lifting machinery to society.
Shandong Dongyue Lifting Fire Fighting Equipment Manufacturing Co.,Ltd is a designated construction machinery production enterprise by the National Technical Supervision Bureau. Since entering this field, the company has been committed to putting quality and service at the center of all work.
We have introduced talents from various fields and successively developed the QTZ63 (5013), QTZ80 (5610) (5613), QTZ100 (6012) (6013), QTZ160 (6018) (6515), QTP60 (5010), QTP80 (5613), QTP100 (6013) series tower cranes and SC200/200 construction elevators.
All of our products adopt the internationally leading "TZDP" optimized design, with a reasonable structure, uniform stress, superior performance, and favorable prices. Continuously receiving unanimous praise and appreciation from users in over 20 provinces and cities across the country.
Construction elevators with several levels or more should not be used in strong wind conditions
Construction elevators usually stop working under wind speeds of five to six levels.
1, Why can't construction elevators be used in strong wind conditions?
As a vertical transportation equipment, construction elevators are usually installed on the outside or inside of buildings. The instability of their fixation and the safety issues caused by their height need to be taken seriously. Therefore, in strong wind conditions, the stability of elevators at high altitudes may be affected, leading to elevator shaking, tilting, or displacement. If the construction elevator continues to be used in this situation, it will create serious safety hazards and cause accidents.
2, Under what circumstances do construction elevators need to be shut down?
Construction elevators usually need to stop working under wind speeds of five to six levels, as the wind has already reached a certain intensity, which may pose a threat to the safety of the elevator. In addition, construction elevators also need to be suspended under adverse weather conditions such as lightning, hail, and haze. In addition, if there is any malfunction or abnormal behavior in the construction elevator, it is also necessary to immediately stop work and carry out maintenance.
3, What safety measures should be taken during the use of construction elevators?
During the use of construction elevators, it is necessary to pay attention to the following safety measures: 1. Regularly check the condition of elevator accessories, such as steel ropes, brakes, speed limiters, etc., to ensure their normal operation; 2. The elevator should be equipped with sufficient and qualified fire extinguishers, first aid kits, and other equipment; 3. Operators on elevators should receive professional training and hold relevant qualification certificates; In the event of a power outage, people inside the elevator should remain calm and operate according to the indicators inside the elevator.
4, Summary
Construction elevators play a crucial role in construction sites, but safety needs to be taken into account under specific weather conditions. In strong wind conditions, construction elevators need to be stopped until the wind drops to a safe range. During use, it is also necessary to pay attention to other safety measures to ensure the safety of workers.